National Repository of Grey Literature 19 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Execution of Multifunctional Building in Lužice - Building Construction Project
Mouka, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The diploma thesis deals with the solution of the multi-purpose building project in Lužice. This work includes the extended accompanying and summary technical report, the coordination situation of the construction, the technical report of the transport relations and the coordination of the oversized transport, the object time schedule and the financial plan of the construction, the plan for providing the material resources containing the staff balance for the construction of the main building, the time schedule for the assembly of the prefabricated skeleton, technological standard for prefabricated skeleton, design of main building machines and mechanisms including their time commitment, organization of construction of multipurpose building including drawings of construction site equipment, technological regulation for assembling of prefabricated skeleton and for making of reinforced concrete floor, inspection and testing plan for prefabricated skeleton assembly, lifting mechanism, assembly schemes for prefabricated skeleton elements, lifting mechanism verification schemes, item budget prefabricated skeleton chalk and instructions for building use and maintenance.
Construction-technological project of the extension of the production hall
Mézl, Petr ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of the main construction machines and mechanisms, including their time commitment , organization of the construction of the building including drawings of the construction site equipment, technological regulation for the assembly of the prefabricated skeleton and the laying of the floor formation, inspection and testing plan for the prefabricated skeleton assembly, summary assessment of the lifting mechanism selection, schematic of the assembly procedure of the prefabricated skeleton elements, protection and health at work during construction.
LD Seating production hall - construction technology project
Jůzl, Martin ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is a building-technological project on the production and assembly hall LD Seating in Boskovice u Brna. The solution is influenced by the existing hall in the area of the investor, where there will be a future new building. Based on this fact, the appropriate measures are chosen. The project puts emphasis on the off-road transport and the technological process of assembly of the prefabricated reinforced concrete hall, which will be solved from the financial and time point of view. The workflow will be affected by machine assembly, site facilities, and wider transport relationships. The project also solves the concept of the whole issue as a whole. All building objects are taken into account. Based on this, an object schedule and budget are developed.
Building Construction Project - Implementation of Production Hall ADS s.r.o. Větřkovice
Ráb, Jakub ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The subject of my master's thesis is construction technological project of the hall ADS s.r.o. Větřkovice. The work includes technical report of construction technological project, facilities of construction zone, solving traffic routes from the production to the place of construction, study of the implementation of the main technological stages of the building SO02, the most appropriate machine assembly, technological specification for drilled piles and for montage of prefabricated reinforced concrete skeleton, control and test plan, schedule of work, itemized budget, plan of the safety and health protection during work, proposals of design of movement mechanisms and time and financial discretion of realization of the reinforced areas of the production hall area.
Construction technology project of the Sports Center in Brno
Kuchta, Peter ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
This diploma thesis concerns construction technology preparation of a sport centre in Brno, Řečkovice. The objective of the thesis is to design economically appropriate course of construction works, in accordance with technological requirements and principles of health and occupational safety during the realization of particular structures and parts of the construction. The thesis contains basic information about the construction, the developer, the author of the project documentation and about conducted surveys. Further it includes the construction technology project, its financial and time effort, traffic relations of the construction site, the situation of the construction site, proposal of the machinery equipment, economical of the principal construction machinery and technological standard. This thesis is focused on lower gross fabric with special foundation on pylons.
Implementation of Production Hall in Hulín
Holba, Petr ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The topic of the diploma thesis is a solution of the construction and a technological project of a production hall in Hulín. The thesis consists of an accompanying and a summary technical report, a study of the main technological stages implementation, a coordination situation of the construction with the closer transport relations, a solution of wider transport route relationships including a proposal of the building supply and an oversized transport solution, an object time schedule and a financial plan of the construction including the staff balance, a time schedule for the selected processes of the main building object, a design of the main building machines including an assessment of a lifting mechanism, a technological regulation for assembling of a prefabricated skeleton including a health and a safety plan, a technological regulation for a wire-concrete floor realization including a quality control and a health and a safety plan, a project of site equipment, a control and a test plan for prefabricated skeleton assembly. And also a budget item for selected technological processes, an assembly scheme for the prefabricated skeleton and a schemes´composition of the wire-concrete floor.
Construction of the Hotel Karpaty in Valašské Klobouky
Šánek, Adam ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The subject of my diploma thesis is the solution of the construction of the Hotel Karpaty located near the town of Valašské Klobouky. The thesis contains an accompanying technical report, solution of transport routes, including traffic situation, time and financial plan of construction, study of implementation of main technological stages, construction site project with division into individual stages, drawing part and construction site report, design of main working machines and mechanisms, time hotel construction plan, plan for securing material resources, including budget and staff needs chart, technological regulation of monolithic ceiling structures, control and test plan for monolithic ceiling structures, design and installation of Schüco aluminum windows, design of construction measures Hotel Karpaty according to LEED standard.
Poděbradská Commercial and Administrative Center - construction technology project
Kmeť, Peter ; Boháček, Adam (referee) ; Biely, Boris (advisor)
This diploma thesis focuses on construction technology preparation of shopping center in Prague 9, Vysočany. The aim of this work was to choose an appropriate construction process. The thesis contains general information about construction with construction technology project, its financial and time consuming, facilities for construction and traffic situation in the surroundings of the construction, design of main machinery and mechanisms, technological regulation with control and test plan. The diploma thesis is focused on piles realization.
Execution of Building Construction Phase - Extension of Former Tower Silo in Olomouc
Ráb, Jakub ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of my bachelor thesis is construction technological solution of the rough upper construction realization of the extension of former tower silo in Olomouc. The work includes technical report object, facilities of construction zone, solving traffic routes from the production to the place of construction, technological specification for prefabricated and monolithic reinforced concrete constructions, the most appropriate machine assembly, the most appropriate machines assembly, schedule of work, itemized budget, control and test plan and safety and Health protection during work.
Construction of the Hotel Karpaty in Valašské Klobouky
Šánek, Adam ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The subject of my diploma thesis is the solution of the construction of the Hotel Karpaty located near the town of Valašské Klobouky. The thesis contains an accompanying technical report, solution of transport routes, including traffic situation, time and financial plan of construction, study of implementation of main technological stages, construction site project with division into individual stages, drawing part and construction site report, design of main working machines and mechanisms, time hotel construction plan, plan for securing material resources, including budget and staff needs chart, technological regulation of monolithic ceiling structures, control and test plan for monolithic ceiling structures, design and installation of Schüco aluminum windows, design of construction measures Hotel Karpaty according to LEED standard.

National Repository of Grey Literature : 19 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.